1.
|
Sr. Asst. Director
(Compressor Project) ( May 1, 2015 - Continuing)
|
|
Walton Hi-Tech Industries Ltd.
Company Location: Chandra, Gazipur Department: Compressor Project
Duties/Responsibilities:
1. According to project requirement- sourcing and installation of compressor parts manufacturing line. 2. Correlating different department (maintenance, production, QC, automation) to work on the Stator & Rotor manufacturing line, Welding line, and Different labs -based on the production plan.
3.
Taking care of electrical & electronics related any requirement based on
compressor project.
4.
Trained from SECOP Austria, on compressor manufacturing process, compressor
designing variables & Compressor Application for better performance.
6.
Responsible for developing Inverter driven BLDC compressor, by keeping the
same manufacturing line.
7.
Working in the Team of WALPHA-2 heavy duty model development
Installed Projects:
As Project Head:
i)
Full Automatic Stator
Manufacturing Line Installation and Commissioning. (Machines: Stack height
making machine, winding machine, forming machine, Lacing machine, testing
machine etc.)
ii)
Rotor Line Installation and
Commissioning. (Machines: Die-Casting machine, Aluminium melting furnace,
Heat Treatment, lamination punching machine, testing machine etc.)
iii)
Rotor-Flange bearing-Crankshaft
pairing station installation.
iv)
Semi-Automatic Shell welding and
pipe bending line installation (Spot welding and Medium frequency welding)
v)
Enemelled fine cupper wire testing
lab setup.
vi)
Compressor Performance lab setup. (Facility:
Life test, Noise test, Quick test, Caloriemeter, Overload Tester, Lock Rotor
Tester)
vii)
Motor R&D Lab setup. (Ongoing)
|
2.
|
Electrical & Instrumentation
Engineer ( March 1, 2013 - April 30, 2015)
|
|
Petromax Refinery Ltd
Company Location: Mongla, Bagerhat Department: Electrical & Instrumentation Duties/Responsibilities: 1. Acting shift in-charge of E&I department for emergency support & all kind of maintenance of 2500 barrel capacity refinery plant.
2.
Installation, Maintenance, Instrumentation, Calibration, Commissioning &
Operation of: A). Instruments (TT, LT, FT, PT, Automatic Valves, Mass Flow
meters etc. B) PLC based large DCS systems, LCR, MCC room controlling C) UPS
(20, 40 & 1600KVA) D) Fire & Gas Detection System, Flare &
Cooling Water System E) VFD (Smaller/Larger), VCS, ACB, Allan-Bradley PLC
(Hardware-Software configuration), Relay Control, Inverter Maintenance and
Electrical Appliance Maintenance.
3. Understanding of Electrical
drawings (P&ID) for equipment’s (motor, pumps, compressors, Distillation
Column, Drums, Injection Packages of CFU, NHT, CRU) and doing necessary
modifications based on process requirements.
4. Maintenance of 2285KVA Diesel Generator (MTU Gen-set), Induction Motors from 0.5KW to 316KW, Reciprocating V-type Compressors (SIAD), Instrument Air Compressors (BOGE), Heaters (HEATec, Born),
5. Hydrogen generator & its
compressor maintenance, safety and smooth operations. (Angstrom and RIX
industries)
6. Ship experience (oil carrying). maintenance of main engine, generator, wince motor, air conditioning system, radar system, fuel chambers (double bottom and normal), piping plan, safety, firefighting system etc. 7. Water Treatment Plant, Oil-Water Seperator, Fire fighting systems Operation & Maintenance etc. |
3.
|
Maintenance Engineer ( November 5,
2012 - February 28, 2013)
|
|
PRAN-RFL Group
Company Location: Ghorashal, Narshingdi Department: DPL (Durable plastic-Tufting) Duties/Responsibilities: 1. Was responsible for maintenance of machines in tufting section, DPL 2. Ensuring security and production of man and machine on floor. 3. Communication with admin, sales, and suppliers for new and existing product sales & development. 4. Maintenance Experience on- Tufting machine, Injection molding machine, Blow molding machine, Shrink-Wrap machine, cutter machines, Sealer machine and Taping machine. |
Comments